BVEM Offshore intelligent bottom feed Vibroflotation Stone Column Pile Construction barge
Vibro-bottom feed is an extension application of tranditional vibroflotation to expand the applicable range of vibroflotation technology.
A special vibroflotation method which can realize the filling material direct reaching at the real-time borehole bottom position of pile making through the feeding pipe attached to the vibroflotation equipment, and carries out the stone column or sand pile making.
Development of Bottom Feed Vibroflotation:
1. Entend the applicable scope of vibroflotation,can be used for silt soil improvement, offshore construction,dry method construction and project that require accurately control diameter
2. According to condition, customized equipment can be realized to execute construction under different situation
3. Whole process construction data record and automatic construction can be realized
4. Facilitate to reduce the waste of stone and carry out environmental and green construction
5. Dry, water and linkage of air&water method can be realized
6. Can realize pulverized stone coumn construction
Bottom feed vibroflot system offshore barge type
1. Automatic one key pile making can be realized
2. With automatic feeding system, automatic pile alignment system and simple construction operation system
Application
The product has been successfully applied to the land construction of the bottom packing vibroflotation construction project of the new container terminal in Tiba Bay, East Timor.
(1) Main construction equipment
The vibroflotation equipment adopts Beijing vibroflotation bjzc-bfs-400-180 double lock pressure silo bottom discharge vibroflotation system, and two construction barges are used to assemble 4 sets and 3 sets of bottom discharge vibroflotation systems in parallel. The construction feeding system adopts the automatic control belt conveying system, which can realize full-automatic construction through computer operation.
(2) Intelligent offshore bottom feed vibroflotation construction
The offshore vibroflotation construction of the project adopts the world's leading gravel pile construction management system. Through this system, combined with the full view video monitoring system, the constructors can realize automatic pile driving in the central control room set in the cabin, and achieve better construction control and construction efficiency than the construction in front of the crane.
(3) Construction effect
The offshore vibroflotation construction of bottom filler adopts the offshore GPS positioning system, and through the intelligent Vibroflotation Gravel Pile Construction management system, the construction of 17000 underwater gravel piles is completed in the construction area with a water depth of about 15 m, a maximum SPT of 70 blows and a maximum pile depth of 26 M. The construction efficiency and quality meet the expected requirements of the owner. It fully reflects the applicability of bottom discharge vibroflotation construction technology in water area construction.
Bottom feed vibroflot system manufacturer--Beijing Vibroflotation Engineering Machinery Co.,Ltd (BVEM)
1.Ten years R&D on bottom feed system,first complete set of bottom feed vibroflot supplier which can represent advanced level in China
2. Cheif-editor of China's electric vibroflot manufacturing standard
3. Researcher and developer of vibroflotation whole process quality control and management
4. China Three-Gorge Prject,Hong Kong-Zhuhai-Macao Bridge and dozens of other major domestic projects participants and technical breakthroughs